Factory Customized Lightweight Reusable Geoplast ABS Plastic Formwork for Walls Columns Slabs Construction

Customization: Available
After-sales Service: Remote Service
Warranty: One Year

Product Description

Basic Information

Model NO.
Plastic Formwork
Certification
ISO9000
Material
ABS
Type
Wall Formwork
Unit Weight
Around 15kg/Sqm
Permitted Pressure
60 Kn/Sqm
Usage Time
100 Times
Color
Black or Customized

Product Description

Plastic formwork is part of a method used to mass produce simple concrete structures. The formwork is put together to form a mold for concrete. Workers place the formwork in the position where a wall needs to be and then pour concrete directly into the form. After it hardens, the form is removed and the wall is fully formed without any additional work. By using a pre-made set of plastic formworks, workers can quickly mass-produce simple buildings.

Plastic Formwork Structure

Plastic formwork are moulds made using high-quality plastics. These are generally infused with toughened fibreglass in order to reinforce the load-bearing capacity of the material. They carry a load of poured concrete until it is dry and ready to stand by itself. ABS is used in plastic formworks due to its high mechanical strength compared to regular plastics. Moreover, it has a higher resistance to shock and is a stable plastic component.

ABS Plastic Formwork

Applications

Common structure type - Wall

Wall Application

Common structure type - Column & Floorslab

Column Application Floorslab Application 1 Floorslab Application 2

Other Available Construction Types

1. Bridge Cap Pouring | 2. Side wall of subway projects

Subway project 1 Subway project 2
Project Overview 1 Project Overview 2 Project Overview 3

Product Characteristics

Long lifespan & Cost effective Plastic formwork can be reused over 100 times, while Plywood can only be reused 3 to 5 times.
Waterproof Imputrescible and rustless, especially suitable for underground and watery circumstances.
Interlocking Design No release agent needed, providing a good effect for demolding.
Simple Installation Light weight and safe to handle, easy to clean, and very robust.
High Quality Excellent abrasion resistance, mechanical properties, and best impermeability.
Recyclable Waste scrap molding boards can be fully recycled.

Packing & Delivery

Packing Details:

  • Total net weight of loaded container: 22 to 25 tons.
  • Bundles: Timber beams, steel props, tie rods, etc.
  • Pallets: Small parts are bagged and placed on pallets.
  • Wooden cases: Available upon customer request.

Delivery:

  • Production: Normally 20-30 days for a full container after down payment.
  • Transportation: Depends on the destination port.
Packing and Shipping

Professional Service

1. Consulting, Design, and Quotation

We offer general ideas of various systems to fit your project demand and provide customized forming proposals using Auto-CAD.

2. Manufacture and Quality Inspection

Large-scale production with first-class lines and professional quality inspection teams ensure high-standard products.

3. Instruction

We provide remote or on-site guidance to ensure customers feel at ease throughout the entire process.

Our Expertise

We are a leading formwork and scaffolding company. Since 2010, we have successfully delivered a large number of projects globally, including bridges, tunnels, power stations, and civil constructions. Utilizing our strong technical background and abundant engineering experience, we focus on cost-effectiveness and efficiency for our clients.

Factory Facility 1 Factory Facility 2

Customer Cooperation

Customer Photos

Frequently Asked Questions

Are you a trading company or manufacturer?
We are a factory and direct manufacturer.
What types of structures can your formwork be used for?
We design and manufacture products for housing, multi-story structures, high-rise buildings, bridges, hydropower stations, and industrial structures.
Do you provide samples?
Yes, we can offer samples for free, though the freight cost is typically not included.
What is required for a design and quotation?
We generally need the structural drawings and section drawings of your project.
How long does production take?
Generally, it takes 30 to 60 days depending on the type and quantity of products.
What are your terms of payment?
For orders over 1000USD, we typically require 30% T/T in advance and the balance before shipment.

Related Products